| Master before |
![]() |
| Zoey's room after |
![]() |
| Zoey's room before |
![]() |
| Master after |
![]() |
| Front of house before |
![]() |
| Front of house after - with new door! |
![]() |
| Hallway before - during demo |
-Repainted all the outer railings
-Had a company drill a hole in the foundation so we could vent the dryer out normally instead of through a brand-new window
-Set up dryer vent and accompanying duct work
-Moved water and electricity in laundry room so the washer and dryer are next to each other instead of across the room from each other
-Removed wallpaper
-Removed and replaced all baseboards and door moldings
-Painted entire upstairs, including closets, window sills and door jams
-New front door
-New light fixtures and smoke detectors
-Put chimney cover on
-New light switches, outlet covers and vent covers
-Replumbed the ENTIRE house (except from the house to the meter at the street) - I'm really happy/excited about this even though it was an unexpected thing added.
-Ran new main power into the house
-Consolidated the two power panels into one large breaker box in the laundry room
-Ran new electricity in the bathroom, kitchen and laundry room, grounding everything and adding necessary GFI outlets and unburying boxes and wires in walls
-Put new hardware on hallway closet
-Took bathroom floor down to the subfloor (2 layers) and tiled.
-Replaced toilet and vanity (I'll have to tell the vanity drama another time) and all hardware in the upstairs bathroom
-Walled off hallway closet and put door in kitchen making it a pantry
-Removed soffit boxes in kitchen (raining insulation from the attic that needed to be fixed)
-Replaced all kitchen cabinets, countertops, sink and garbage disposal
-Moved disposal switch and light switch into outer wall which meant grinding a trench through wall
- Removed pocket door and widened entryway and back exitway of kitchen
- Moved range gas line for new layout of kitchen (also wired for electrical range)
-Added new wood to the kitchen floor for the new cabinets and pantry
-Added new wood to the kitchen floor for the new cabinets and pantry
-Put plantation shutters in the whole upstairs and blinds in the downstairs
- I let Dallin paint these 2 hidden doors into the utility room BYU blue (moment of weakness? It's behind a door)
-Pulled up all carpet upstairs and tack board
-Laid all new wood floors upstairs and carpet in Zoey's room
-Ran water into the kitchen to add a dishwasher (hooray!) and ice for the fridge
-All new interior doors (drilled for existing hinges)
-Carpets downstairs cleaned and ducts cleaned
-Sprayed for spiders
![]() |
| Kitchen before |
![]() |
| Kitchen during demo- with insulation |
![]() |
| Kitchen after - ahh! |
![]() |
| Kitchen after - with work tools |
![]() |
| Living room before |
![]() |
| Bathroom after |


















1 comment:
It looks so beautiful and I bet it feels so good to know all the things you guys accomplished!